How to Get Solar Panels Installed in the UK: A Step-by-Step 2025 Guide

Thinking of installing solar panels on your UK home or business? It’s a smart move — but knowing the correct process can save time, money, and stress. This step-by-step guide walks you through exactly what to expect, from assessing your roof to generating your own energy.

This 2025 guide includes all the current regulations, certifications, and incentives relevant to UK homeowners and businesses.

Step 1: Assess Your Property’s Suitability

Before anything else, check if your property is suitable for solar panels:

  • Roof direction: South-facing roofs generate the most electricity, but east- and west-facing roofs also perform well.
  • Shading: Avoid trees, chimneys, or nearby buildings casting shade on your panels.
  • Roof size and condition: You’ll need enough usable space and a roof in good condition. Older roofs may require repairs or reinforcement.
  • Structural integrity: A professional installer can confirm whether your roof can support solar panels.

For businesses, also assess available flat roof or ground space for larger commercial systems.

Step 2: Calculate Your Energy Usage

Look at your annual electricity consumption from your energy bills. This helps determine:

  • The ideal system size (in kW)
  • Whether you’d benefit from battery storage
  • The potential savings and SEG export earnings

A typical 3.5kW system suits most UK households, while businesses may require systems of 10kW or more.

Step 3: Get Multiple Quotes from MCS-Certified Installers

Always compare at least 3 quotes from reputable solar panel installers who are MCS-certified (Microgeneration Certification Scheme). Certification ensures:

  • The installer meets UK standards
  • You qualify for the Smart Export Guarantee (SEG)
  • Your system is eligible for insurance and finance options

Ask for a detailed quote including:

  • System size and type (e.g., monocrystalline vs polycrystalline)
  • Panel brand and warranty
  • Inverter and battery details (if included)
  • Total cost (including VAT)
  • Payback time and expected savings

Use comparison sites or the MCS website to find approved installers in your area.

Step 4: Check for Incentives and Funding

Before agreeing to installation, explore which grants or financial support are available:

  • Smart Export Guarantee (SEG) – Get paid for electricity you export to the grid.
  • ECO4 scheme – Low-income households may be eligible for free or discounted panels.
  • Zero VAT – Solar panel installations remain VAT-exempt until 2027.
  • Local council schemes – Some regions offer additional funding or interest-free loans.

Make sure your installer helps you navigate applications for any schemes you qualify for.

Step 5: Apply for Planning Permission (if Required)

In most cases, solar panels fall under permitted development rights, meaning you do not need planning permission. However, you’ll need permission if:

  • Your home is listed
  • You live in a conservation area or national park
  • You’re installing ground-mounted solar panels
  • Panels protrude more than 200mm from the roof

Always check with your local planning authority before proceeding.

Step 6: Schedule the Installation

Once you’ve chosen an installer, signed the contract, and arranged financing (if needed), you’ll schedule the installation. A standard domestic system takes 1–2 days to install.

Here’s what to expect:

  • Scaffolding is erected for roof access
  • Roof brackets and rails are fixed in place
  • Panels are mounted securely
  • Inverter and cabling are installed and connected to your home’s fuse board
  • If you’re adding a battery, it’s installed near the inverter or in a utility area
  • A generation meter and monitoring app are configured

Make sure the installer walks you through system operation and maintenance.

Step 7: Register Your System and Apply for SEG

Your installer will issue an MCS certificate once installation is complete. You’ll need this to register your system for:

  • SEG payments (contact your electricity supplier to enrol)
  • Building Regulations compliance
  • Home insurance updates

You may also receive a DNO notification (from the Distribution Network Operator) confirming that your system has been safely connected to the grid.

SEG suppliers will usually require:

  • Proof of MCS certification
  • Details of your smart meter (needed for accurate export readings)
  • A copy of your installation quote or invoice

Step 8: Start Generating and Saving

With your system installed and SEG registration complete, you’ll begin generating your own renewable electricity. Most households notice immediate drops in their electricity bills — and you’ll get SEG payments every quarter for surplus energy exported to the grid.

Use your monitoring system or app to:

  • Track daily, weekly, and monthly performance
  • Optimise usage by running appliances during daylight hours
  • Maximise savings with smart timers and battery usage

Step 9: Maintain Your Solar System

Solar panels are low-maintenance, but to keep them performing efficiently:

  • Clean panels once or twice a year if accessible (or hire a professional)
  • Check inverter lights or app for error messages
  • Schedule a service check every 5–10 years, especially if you have a battery

Most panels come with 25-year performance warranties, and inverters typically last 10–15 years.


Quick Checklist

✅ Roof checked and suitable
✅ Energy usage reviewed
✅ 3+ MCS-certified quotes gathered
✅ Incentives or grants reviewed
✅ Planning permission checked (if needed)
✅ Installation scheduled
✅ SEG registration submitted
✅ Monitoring system working
✅ System maintained regularly


FAQs About Solar Panel Installation in the UK

How long does it take to install solar panels?
Most domestic systems take 1 to 2 days, while larger commercial systems may take a week or more.

Do I need a battery with my solar panels?
Not required, but batteries can help you store and use more of your solar power, increasing savings.

How much roof space do I need for solar panels?
A typical 3.5kW system requires about 15–20 square metres of unshaded roof space.

Can I install solar panels myself?
No. To qualify for incentives and ensure safety, installations must be done by an MCS-certified professional.

What happens on cloudy days?
Solar panels still generate electricity in diffuse light, just at reduced output. You’ll still be connected to the grid for backup.


Final Word

Getting solar panels installed in the UK in 2025 is more straightforward and financially rewarding than ever. With a clear process, government-backed incentives, and certified professionals ready to help, there’s never been a better time to make the switch to clean energy.

Follow these steps carefully, and you could be generating your own electricity, cutting your bills, and earning income from exports — all within just a few weeks.

Related Content

What UK Homeowners Stand to Save from Solar Panels in 2025

UK Solar Grants & Incentives Explained: What Homeowners Can Claim in 2025

Are Solar Panels Really Worth It in the UK’s Cloudy Weather?

Leave a Comment